New re-zoning drawings have been submitted to City Planning in May. The two biggest changes are the “Breezeway” on Ontario Street is gone. There is now a green roof for amenities on the 8th floor.
The Building remains 7 storeys + 1 storey for mechanical and green roof. We have posted the revised drawings on our website.
The revised re-zoning proposal documents are available for download from the City of Toronto site CLICK HERE.
Beer Store?
We still do not know if the Beer Store is returning as a tenant.