June 6, 2018
The Beer Store Re-Development - 227 Gerrard St.

Beer Store Re-Development May Update

New re-zoning drawings have been submitted to City Planning in May. The two biggest changes are the “Breezeway” on Ontario Street is gone. There is now a green roof for amenities on the 8th floor. The Building remains 7 storeys + 1 storey for mechanical and green roof. We have posted the revised drawings […]
January 3, 2018
The Beer Store - 227 Gerrard St. Condo Entrance

Beer Store Goes to the OMB

The Beer Store Developer and architect has met with a number of area residents and they are open to ongoing discussions in hopes of creating a plan in keeping with the look and feel of the neighbourhood. The development has design has evolved. It is 1 storey shorter (8 storey […]
August 24, 2017
The Beer Store - 227 Gerrard St - August 1, 2017

Update on Beer Store Development Application

  Update on Beer Store Development Application Members of our Board and interested area residents have met with the developer and architects of the 227 Gerrard Street East Beer Store property in hopes of making changes to the height and design of the proposed building. The Beer Store Condo developer […]
May 19, 2017
227 Gerrard St. Beer Store, Toronto ON

Meeting with Developer/Architect for Beer Store Condo

Meeting with developer/architect for Beer Store Condo Under Construction A group of area residents met with the developer and architectural team fro the proposed condo in early May of 2017 Here is a brief update. Overall went very well. They are re-visiting the drawings to incorporate our comments, historic and […]
March 19, 2017
Beer Store - 227 Gerrard St

Beer Store Redevelopment Public Meeting